Configuring program delays

Configuring program delays

Let's say that you'd like to wait for a set period of time until you follow up a campaign that was sent with another automatic campaign: this is where you will want to add a Delay node to your program.

delay_thumb.jpg
delay_controls.jpg

In the example we run through here, the program will require a delay of 7 days between campaign sends.

Drag and drop a delay node from the side panel onto the canvas, making sure it attaches to the previous node. Click on the delay node to set the length of the delay. A panel will slide in from the right side of the screen.

Select the amount of days you'd like to set for the delay by either using the incrementing buttons or by making an entry into the field itself. Click Apply when you're happy.

The Delay element will populate accordingly on the canvas.

Optional controls: time of day

By default, a contact will be held in a delay node for a fixed number of days (a multiple of 24 hours).

You also have the option to:

  • Wait until a set time of day; or
  • Wait a set number of days, and until a specific time on that day

Wait until a set time of day

In this scenario, a contact will be held in the delay until the clock next reaches that time. So a contact joining a delay step of "Wait until 11:00" at 10:00 will be held until an hour later that day. A Contact joining a delay step of "Wait until 09:00" at 10:00 will be held until 09:00 the following morning.

Wait a set number of days, and until a specific time on that day

In this scenario, a contact will be held until the given number of days has been reached; and moved on from the delay step at the given time. So a contact joining a delay step of "Wait until 2 days later at 10:00" at 08:00 will be held for 50 hours (just over 2 days). A contact joining a delay step of "Wait until 2 days later at 10:00" at 12:00 will be held for 46 hours (just under 2 days).

An example explaining what would happen to a contact joining the delay step at the current time is displayed below the controls

 

NEXT:

    • Related Articles

    • Configuring program start rules

      The Start node is the only node on the canvas to begin with. This is the first node of your program requiring your attention. Click on the Start node to define the criteria for when contacts are added to your program. A panel of options will slide in ...
    • Getting Started with the Program Builder

      Contents Building a program » Node settings » Connecting nodes » Creating branches Validation Saving and activating Summary The program builder features nodes - actions, delays, decisions and end points - linked with connectors, enabling you to ...
    • Program validation

      As you build your program you may notice the yellow box in the Validation control updating. This is where you can keep track of actions that need to be done before your program is complete. You can save an invalid program but you will not to be able ...
    • Working with the program builder canvas interface

      Contents Working with program nodes Working with program connectors » Naming end nodes » Moving, duplicating and deleting nodes » Annotations Finding your way around the program canvas » Zooming in and out Undoing and redoing Summary Whenever you ...
    • Using exit conditions to remove contacts from a program

      Summary You can add exit conditions to a program to remove contacts at any step along the way, providing the contact meets the exit rules that have been set up. This is extremely useful in the case of: lead nurturing programs - if you have a series ...